TEMPORARY BRIDGES · SITE ACCESS
Super Bridge
A quick temporary bridge for public or worker access on site. A 35 m free span can go up in as little as one day.A quick temporary bridge for site access.

At a glance
35 m
Free span, nothing in between
1 day
To put up a 35 m span
10 kPa
Roof protection overhead
Weatherproof
Covered option for public and workers
- Public and worker access on site
- Super Access boxes are pre-built off-site
- All components fit together
TWO SYSTEMS
On site
SuperBridge for crossings, and Super Access: modular boxes built off-site like LEGO, lifted in and installed within a day.SuperBridge for crossings, Super Access boxes built off-site.

SuperBridge · KL Marathon 2018 
Super Access · Uptown Damansara 
Super Access · Installed 
SuperBridge · Maybank · Deck over escalator 
SuperBridge · Maybank · Frame from below 
SuperBridge · Maybank · Crew on site






16.
Super Bridge job photos on file
From the Super Bridge build at Maybank.
